380 kV Station Vijfhuizen

EL-CON was awarded the primary part of the tender for Vijfhuizen Station by DYNNIQ (then Imtech). The feat is the prefab construction of the Aluminum Busbar systems, so that as few operations as possible are required on-site. This saves time and increases reliability for the main contractor.

EL-CON is a knowledge partner in High Voltage.

Leave a Reply

Your email address will not be published. Required fields are marked *